ASTM D3330/D3330M-04(10) standard Test Method for Peel Adhesion of Pressure-Sensitive Tape ASTM D3330/D3330M-04(10) 压敏胶带的剥离强度的标准试验方法 样品要求:试样:25×300mm, 5 pcs 建议送样25mm宽胶带一卷 周期: 7~9工作日
GB/T 4852 压敏胶粘带初粘性试验
GB/T 4852-2002 Test method for tack of pressure sensitive adhesive tapes by rolling ball GB/T 4852-2002 压敏胶粘带初粘性试验方法(滚球法) 样品要求:方法A:250×10~80mm, 5 pcs 方法B:100×25mm, 5 pcs 周期: 7~9工作日
ASTM D3121 压敏胶粘带初粘性试验
ASTM D3121-06 Test method for tack of pressure sensitive adhesive tapes by rolling ball ASTM D3121-06 压敏胶粘带初粘性试验方法(滚球法) 样品要求:标准试样:381×51mm, 5pcs 周期: 7~9工作日
ASTM D3759 压敏带拉伸强度和伸长率试验
ASTM D3759/D3759M-05 Standard Test Method for Breaking Strength and Elongation of Pressure-Sensitive Tape ASTM D3759/D3759M-05压敏带拉伸强度和伸长率的试验方法 样品要求:至少1500mm×12~25mm, 建议送样12~25mm宽样品一卷 周期: 7~9工作日
ASTM D3811 压敏胶带解卷力测试
ASTM D3811/D3811M-96(2006) standard test method for unwind force of pressure-sensitive tapes ASTM D3811/D3811M-96(2006)压敏胶带解卷力测试 样品要求:成品胶带1卷 周期: 7~9工作日
ASTM D5750 压敏带宽度和长度指南
ASTM D5750/D5750M-95(2006)Standard Guide for Width and Length of Pressure-Sensitive Tape ASTM D5750/D5750M-95(2006压敏带宽度和长度指南 样品要求:成品胶带3卷 周期: 7~9工作日
ASTM D3652 压敏带厚度试验
ASTM D3652/D3652M-01(2006) Standard Test Method for Thickness of Pressure-Sensitive Tapes ASTM D3652/D3652M-01(2006)压敏带厚度的试验方法 样品要求:至少 50mm×25mm 建议送25mm宽胶带一卷 周期: 7~9工作日 Scope: 1.1 This test method covers the determination of the thickness of pressure-sensitive tapes at standard conditions.1.2 The values stated in either SI or inch-pound units are to be regarded separately as standard. […]
GB/T 9640 泡沫聚合材料-加速老化试验
GB/T 9640-2008 Flexible and rigid cellular polymeric materials–Accelerated ageing tests GB/T 9640-2008软质和硬质泡沫聚合材料 加速老化试验方法 样品要求:视需要测试的物理性能项目而定 周期:视测试时间而定
ISO 2440 泡沫柔性聚合材料-加速老化试验
ISO 2440-1997 Polymeric materials, cellular flexible; Accelerated ageing tests ISO 2440-1997泡沫柔性聚合材料.加速老化试验 样品要求:视需要测试的物理性能项目而定 周期:视测试时间而定
QB/T 2819 软质泡沫材料长期疲劳性测定
QB/T 2819-2006(软质材料)Flexible cellular materials determination of long time fatigue QB/T 2819-2006(软质材料)软质泡沫材料长期疲劳性能的测定 样品要求:推荐标准尺寸:380×380×50mm, 最少3pcs. 亦可采用其它尺寸的成品部件,但需和客户商定 周期: 7~9工作日